Post Installation

Post Installation

Some moisture used during the installation of the film will remain between the film and glass. The energy from the sun  will complete the drying process. Consequently, the film will  dry quickly under sunny conditions and slower during winter  months. The manufacturer states that this process can take up to 30 days. During this time, small water pockets or a  hazy cloudy appearance may be noticeable. It is best to leave the film alone and ignore the appearance. This will be temporary and completely dissipate when the film is fully cured. The room side of the film is cleaned at the installation and should  not be washed for 30 days. Once the film is fully dried, ammonia free glass cleaners, and soft paper toweling, such as Bounty, should be used. Although the scratch-resistant coating protecting your window film is very durable, it should never be cleaned with abrasive materials or razor blades.  Never apply household tape to window film.